Background & Project Brief

Our client, a specialised engineering projects company based on Australia, needed to install new compressor controls equipment which required a large corrosion resistant enclosure to give easy access for commissioning, maintenance and repairs. The location would be in an IECEx Zone 2 environment. The panel also needed wireless communication for vibration and temperature sensors to assist with predictive maintenance. 

 

Challenges

  • Variety of equipment to be installed in IECEx Zone 2 including a large HMI
  • Inclusion of batteries requiring special assessment
  • Need to meet the requirement of shutdown period
  • Thermal management

 

Outcome

  • A joint feasibility study was carried out with the client, prior to agreeing the final enclosure design.
  • Expo built two large double door enclosures, using 3mm 316L stainless steel to meet the required specifications and timescale. Although a Zone 2 application, each enclosure was fitted with a type X purge system and interface unit to give the end-users a greater level of control. 
  • After shipment to Australia, the customer will install the compressor control, and then the enclosures will be inspected & certified by Expo.

 

Expo Products and Services

  • MiniPurge Type X
  • Custom Enclosure Service
  • Customised Minipurge Interface Unit

Configure your product

Use our product configurator tool to build a system to your exact specification.

GET STARTED

Got a question?

For more information contact your local partner to speak to one of our purge and pressurization experts or contact us.